Originally Posted By allthingsdisney it is one the disneyland calender as going down on sept 5th thats where i got my info so im hoping that is accurate
Originally Posted By LogDog The Matterhorn closes August 28 until November 22. Per www.riderefurbs.com
Originally Posted By FiveBearRugs I'm sorry that I won't get a chance to ride it, but at least it'll save time in my schedule.
Originally Posted By seanyoda Disneyland.com USED to show the rehab for the Matterhorn as starting on August 28. However, it now shows the rehab starting on September 5 and lasting through AT LEAST November 30 (which is the end of the on-line calendar).
Originally Posted By Darkbeer ^ Who knows what is up with Disneyland.com... The Monorail is no longer listed, but the CM's are claiming the last day is Sunday and they are being transferred to other positions.
Originally Posted By allthingsdisney too much confusion im going to go thinking it will be closed ten no disapointment if closed but happiness if open lol
Originally Posted By leeharrell >>Construction photos clearly show that Matterhorn Mountain is made up up of a steel structure. There may be some wood involved, but I rather doubt any wood was used for structural support.<< Nope. LOTS of wood in that thing.
Originally Posted By Kathi K Sure would be nice if they added Fastpass to the Matterhorn. We have not ridden it yet because the lines are always so long.
Originally Posted By berol The line is usually short at opening and, if the park is open late, at closing.
Originally Posted By LacyBelle Don't be intimidated by the looks of the length of the line for the Matterhorn, Kathi K. It really does move fast. When we were there last month, the line was about a quarter of the way around the mountain and we were in bobsleds in 15 minutes.
Originally Posted By GreenMother That's one of the draws for us, that long line. It reminds me of being a kid and seeing that line stretch around the base of the Matterhorn. Although now I don't ride it because it kills my back. Well, actually, I have been talked into it a few times in the last 5 years or so... for the kids' sake. What we won't do for our children, huh?
Originally Posted By nemopoppins Even all the way around the mountain the line for the Matterhorn is only about a half an hour at the most. I think the sign says 45 minutes but it's always less. And it's a fun line to wait in. It moves and either side immerses you in such nice aspects of Disneyland atmosphere, especially when the monorail is running. Besides, the ride is one that is worth the wait.
Originally Posted By AaronInCal Actually, there has been a multi-year plan in place to basically completely "rebuild" the Matterhorn. Usually, this has happened every year just after Labor Day and lasts until the middle of November. Last year, because of the 50th, they did not do a refurb on the mountain. So they are staring back up with those lengthy refurbs this fall.
Originally Posted By labretbear Psst. New sleds, new lederhosen. New sleds, new lederhosen. Pass it along. Thank you.
Originally Posted By Kayoss <<>>Construction photos clearly show that Matterhorn Mountain is made up up of a steel structure. There may be some wood involved, but I rather doubt any wood was used for structural support.<< Nope. LOTS of wood in that thing.>> not to mention the abundance of chicken wire and plaster for the facade itself. Gotta love high tech material!
Originally Posted By FiveBearRugs Will Harold be getting an update or will he stay the same? Anyone notice that not all the Harold AAs look the same? Are they still doing that strobe light flashing at the final Harold scene? I can't seem to remember if they did last year for the 50th...