Originally Posted By vbdad55 <There is no replacement of the ride system. It is being overhaulled but the system and ride vehicles will be the same.< I like the ride system for that particular ride - easy to see - just upgrade the sound and a 100,000 mile tuneup on the smoothness
Originally Posted By Skellington88 I doubt they will fix the bumpiness in the attraction...they probably aren't even aware of it. WDI and Park Ops became very lazy and complacent over the past 10 years and now management won't even give proper budgets to redo attractions. Expect the same bumpiness to return.
Originally Posted By WeirdJohn I disagree. I think you might be surprised. Remember that Siemens' name will be on this ride from now on, and I don't think they will want to do things shoddy. They've already proven that they are taking this seriously with the post ride area. It sounds like it has been very well done.
Originally Posted By danyoung >I also dislike the projections about the rotating part. I understand their purpose when the car rotates backwards, but at the beginning, 6 minutes before it happens, I think it is unnecessary.< What's always amazed me about this, aside from the fact that the message is completely unnecessary to anyone but the stupidest of people who won't benefit from the message in the first place, is the fact that these messages actively take away an important part of the ride - that mysterious ride up the hill, with the voices from the past whispering at you from all around. It was such a nice introduction to the ride, and now it's gone in favor of a stupid warning for stupid people.
Originally Posted By BlueOhanaTerror When I said "replace the ride system" I meant it looks like they're replacing the track/conveyance mechanism, not the actual vehicles. There's nothing wrong with the little cabs themselves. From the PDF that was posted, it sure looks like they'll be replacing whatever runs or pulls all those cabs.